Design Build to replace the failing infrastructure, distribution systems light fixtures, and control systems system. The project scheduled to complete in 765 days. While introducing lean principles with design and inventive construction management utilizing subsurface excavation to minimize disturbance to the Memorial façade, substantial completion under 400 days including CXA.